Tuesday, January 17, 2012

Surface of cast on floor

This morning has done the surface of cast on the floors. The drying is slow during the winter season, so we have to wait 5-6 weeks before tiling work



Monday, January 9, 2012

Work from outside

Photo of the day. There is missing only a few finished works from outside. 



Friday, January 6, 2012

Underfloor heating has installed


A little holiday break because the Christmas is over. The plumber and the electrician has continued their work. The gas fire and underfloor heating has installed. The water is running but electric not.